Home / All / Tech Pack, Patterns & Development Files / How long does it take to turn a tech pack into a production pattern?

How long does it take to turn a tech pack into a production pattern?

Update Time:2026/11/3

With a complete tech pack, pattern making and grading are fast, and the constraint is the first sample, which we run in about seven days. A sales sample for a confirmed style takes two to three weeks. Bulk then runs 60 to 90 days depending on fabric lead time and line capacity.

With an incomplete tech pack you add a rebuild round before sampling can start. That is the single most common cause of a launch date slipping by two weeks.

Classification
  • Beachwear
  • Pyjama
  • Lingerie
CONTACT US
Please send your message to us
*Email
*Name
*Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
social media
facebook / linkedin / twitter / google / youtube / instagram